Gas Solution Liner 300 - Inner TPU outer PE No-dig pipe rehabilitation liner
Home » Products » Trenchless » No-Dig Pipe Rehabilitation » Gas Solution Liner 300 - Inner TPU outer PE No-dig pipe rehabilitation liner

loading

Gas Solution Liner 300 - Inner TPU outer PE No-dig pipe rehabilitation liner Gas Solution Liner 300 - Inner TPU outer PE No-dig pipe rehabilitation liner

Gas Solution Liner 300 - Inner TPU outer PE No-dig pipe rehabilitation liner

Availability:
Quantity:
Gas Solution Liner 300
Raw materials:
High tenacity fabric reinforcement layer,
Abrasion resistance PE cover,
Modified TPU tube.
Product Description

Gas Solution Liner 300

Raw materials:

High tenacity fabric reinforcement layer,

Abrasion resistance PE cover,

Modified TPU tube.

44 - Gas Solution Liner 300

Total three layers:

1. Inner: Modified TPU layer

2. High tenacity fabric reinforcement layer

3. Outer: Abrasion-resistant PE layer

Description

Parameter

Host Pipes ID:

50mm - 800mm (2” - 32”)

Max. Operation Pressure:

1.0 - 4.0 Mpa/145 psi - 580 psi

Max. Bursting Pressure:

3.0 - 12.0 Mpa/435 psi - 1740 psi

Max. Length of Installation:

≥3000m (9900ft)

Wall Thickness:

4mm - 8mm

Abrasion Resistance (DIN 53516)

10.5mm3

Temperature of Media:

-40℃(-40℉) - 70℃ (158℉)

Installation Mode:

Fold in U-shape

Pulling Speed:

Up to 400m/h

Service Life Duration:

20years

*All above technical parameters are for reference, no notice if any changes, details please confirm with ZYfire..


facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button
Previous: 
Next: